Pillar 02 · Platform
Certify green buildings without the spreadsheet archaeology.
CORTEX reviews contractor submittals, tracks every credit, and flags risk before it costs a rating — across LEED, BREEAM, Mostadam and local codes (SBC, Omani).
Built for international standards — LEED · BREEAM · Mostadam · SBC · Omani
MOSTADAM D+C · SS-02 Ecological Protection
Submitted landscape & habitat plan satisfies the protected-area buffer requirement.
- Native planting schedule matched to the regional species list
- Erosion & sediment control plan present and dated
- Soil restoration depth not stated — flagged for review
Who it's for
One platform for every party in the certification process.
From the engineer specifying an assembly to the consultancy signing off a rating — CORTEX gives each role the same grounded source of truth.
Sustainability practitioners
Track every credit across a portfolio and see exactly where a rating is at risk — without rebuilding a tracker for each project.
Green-building engineers
Check contractor submittals against the assemblies and codes you specified, with the clause and the evidence side by side.
Consultancies
Run client certifications from one workspace, share grounded verdicts, and spend review time on judgement, not collation.
How it works
Upload a submittal. Get a clause-by-clause verdict in minutes.
Drag a contractor submittal here, or
Demo only · no file leaves your browser
Upload
Drop a contractor submittal — drawings, specs or product data.
CORTEX reads against the codes
It parses the document and checks it clause by clause against the applicable standards.
Traced verdict + evidence
You get a determination anchored to the exact clause, with the quote and page it came from.
The platform
From complexity to clarity.
Real-time progress tracking
Watch each credit move from queued to certified, with a live picture of what's outstanding and what's at risk.
Automated document review
Every determination is grounded — it cites the clause and the supporting evidence, so a reviewer can check it in seconds.
Multi-certification, one place
LEED, BREEAM, Mostadam and local codes together — plus Scope 1, 2 and 3 carbon tracked alongside compliance.
The difference
Fragmented spreadsheets, or one grounded workspace.
Without CORTEX
- A new spreadsheet per project, copied and drifting out of date
- Submittals reviewed by eye, with no trail back to the clause
- Risk surfacing late — often after it has cost a rating
- Carbon tracked separately, if at all
With CORTEX
- One workspace tracking every credit across the portfolio
- Verdicts anchored to the exact clause and the evidence behind them
- Risk flagged early, while there's still time to fix it
- Scope 1/2/3 carbon sitting next to compliance
Early access
Register your interest.
We're onboarding a small group of design teams, contractors and consultancies in Copenhagen and beyond ahead of launch.
Tell us about your projects and the standards you certify against. We'll prioritise early access for teams whose workflows we can support best at launch.
SKN Computation · Copenhagen, Denmark